Scheduling Connections

Connections between BlueConic and other systems can be instant or they can run a scheduled batch job. This depends on the type of connection. Learn how to configure a schedule for a scheduled batch connection below.

Schedule Settings

Access the schedule settings of a connection by opening the Set up and run panel on the left. Scroll down to Run history and you will find a Run now and cogwheel icon on the right.

Click the cogwheel icon  to open the scheduling settings.

settings.png

First, choose the type of schedule you want. There are four options:

  • Number of times per day
  • Days of the week
  • Day of the month
  • Weekday of the month

Depending on the choice you make, you will have to fill in some extra data to complete the schedule. Be mindful of the amount of time that a task will take and make sure not to set a scheduling time that is shorter.

Once you have set up your schedule the runs will show up under "Runs", including details on each run.

Number of times per day

Select this option if you want to run the connection a fixed number of times per day. Select the number of times that you require the connection to be run. Switch the connection to "ON" and save to kick off the first run.

 

Days of the week

Select the option "Days of the week" if your schedule is supposed to run the task on certain weekdays at a fixed time.

The settings display a row of buttons with the names of the weekdays and a time field. Enter a time and select or deselect days to fit your schedule. A grey button indicates a deselected day; a white button indicates a selected day.

The example above is for a schedule that runs a task every Monday and Friday at 1:30 AM.

Day of the month

Select this option to set a schedule that runs once per month on a given day at a given time. Select the day number and set the time at which the task should run. 

The task will run on the selected day and time. If the day number you selected does not occur in a month (e.g. "31st" in February) the task will not run.

Weekday of the month

Select this option to set a schedule that runs once per month on a given weekday at a given time. Select the day and the time at which the task should run.

 

Runs

Once you have set up a schedule, the schedule will be shown under "Runs":

run_history.png

Scroll the overview down to see previous runs.

Connections will run sequentially in BlueConic. This means that sometimes a planned run will have to wait for another run to complete. When this happens, BlueConic will show the queued connections and the currently running connection. An active run can be aborted by clicking the "Stop" button for that connection.

 

Run
A number indicating the incremental number of the run, "Running" to indicate the task is being run, or "Next" for the projected next run.
Start Date & Time
The time the run started, or will start for the projected next run.
Run Time
The time a run took. Make sure your schedule leaves enough room for the run time of a task, e.g. it does not make sense to start a task every minute if it takes an hour to complete.
Details
Messages from the task during its run. Hover over a particular run to show a "download log" icon on the right hand side. Click the icon to download the log messages for the run.

 

errorlog.png